Cape Town · Est. 2008

Asphalt. Paving. Kerbing.
Done Right the First Time.

Covering the Peninsula from Muizenberg to Milnerton.

18+
Years on the Peninsula
4 200+
Square metres last quarter
100%
CIDB registered crews
Scroll
Asphalt ResurfacingInterlocking PaversTar & ChipKerb & ChannelParking Lot MarkingPothole RepairDriveway ExtensionsBody Corporate ContractsStorm-water ChannelsCape Town PeninsulaAsphalt ResurfacingInterlocking PaversTar & ChipKerb & ChannelParking Lot MarkingPothole RepairDriveway ExtensionsBody Corporate ContractsStorm-water ChannelsCape Town Peninsula
Surface Comparison

The honest numbers.
No vague promises.

Click a row to pre-fill your quote request with that surface type. These figures reflect Cape Town conditions, base prep included.

Metric
Hot-Mix Asphalt
Most popular in Cape Town
Interlocking Pavers
Highest kerb appeal
Tar & Chip
Budget entry option
Cost per m²
Installed, incl. base prep
R 280 – R 380R 450 – R 750R 160 – R 240
Expected Lifespan
15 – 25 years25 – 40 years7 – 12 years
Drainage Rating
Permeable paver option available
GoodExcellentModerate
Maintenance Frequency
Seal every 4–5 yrsRe-sand joints every 5 yrsTop-dress every 3 yrs
Repair Ease
Patch & blend wellLift & replace individualSpot top-dress only
Load Bearing
Heavy vehicles ✓Heavy vehicles ✓Light residential only
Typical Application
Parking lots, drivewaysEstates, showroom forecourtsRural access roads
Winter Rain Performance
Cape Town specific
Excellent with camberExcellentFair — loose chip risk

★ denotes best performer per metric. Prices based on Cape Town metro, standard subbase, 2024 material costs. Complex sites (rock, poor drainage) may vary. Click any row to request that surface type.

Get Your Free Site Assessment
Our Process

Six steps. Nothing hidden.

Every Pave job follows this sequence. If a contractor skips Step 2, the surface will fail within three winters. We don't skip steps.

Site inspector measuring road surface with measuring tape
011–2 hours

Site Inspection

We walk every metre with you. We check subbase condition, drainage falls, kerb alignment, and load requirements before a single quote is written.

Compactor machine preparing road base layer with crushed stone
021–3 days

Base Preparation

G5/G7 crushed stone compacted to 98% Mod AASHTO. No shortcuts. The base is what makes asphalt last 20 years instead of 5.

Worker setting concrete kerb edge along road boundary
03Half day

Edging & Kerbing

Precast or in-situ kerbs are set first, giving the surface a hard edge to compact against. This prevents edge cracking — the most common failure mode.

Asphalt paving machine laying hot mix on road surface
04Day of laying

Laying

Hot-mix asphalt arrives at 160°C and is spread to a consistent 40mm wearing course. Pavers are laid to a string-line on screeded sand.

Steel drum roller compacting fresh asphalt surface
052–4 hours

Compaction

Three roller passes — steel drum, pneumatic, and finishing — achieve 96% Marshall density. You can hear the difference.

Worker applying black sealant to freshly laid asphalt driveway
064–6 hours + cure

Final Sealant

Bitumen emulsion sealer applied within 48 hours of cooling. Road markings, wheel-stops, and signage completed to spec. Site handed back clean.

Who We Work With

Three client types.
All with different needs.

Estate managers need reliability. Body corporates need AGM-ready numbers. Homeowners need it done before the rain. We speak all three languages.

Estate Manager

"Three pothole repairs in two years from the previous contractor. Pave resurfaced the entire 2 400 m² internal road in four days. Zero callouts in 18 months."

2 400 m²
Resurfaced
Brendan Kotzé
Estate Manager · Silverstream Estate, Pinelands
Body Corporate

"The AGM quote was R 312 000 all-in for the parking deck. No surprises at handover. We tabled the price guide PDF and the trustees approved it in one meeting."

R 312k
Approved in 1 meeting
Nadia van der Berg
Body Corporate Chair · Seapoint Gardens Body Corporate
Homeowner

"Extended the driveway by 40 m² for a double garage before the June rains. They finished in two days, cleaned up completely, and the surface has handled every storm since."

40 m²
Extended in 2 days
Tariq Abrahams
Homeowner · Bergvliet, Cape Town
Get In Touch

Start with the free
site assessment.

No obligation. We come to site, assess the subbase condition, measure accurately, and give you a written quote within 48 hours. AGM-ready format available on request.

Not sure? We'll measure — just leave blank.

No obligation. Quotes delivered within 48 hours in AGM-ready format on request.

Prefer to call?

WhatsApp
083 200 0000
Hours

Mon–Fri 07:00 – 17:00
Sat 07:00 – 13:00

Service Coverage

We cover the full Cape Town metro — Atlantic Seaboard, City Bowl, Southern Suburbs, Cape Flats, and Northern Suburbs. Travel surcharge applies beyond Stellenbosch.

Atlantic Seaboard
City Bowl
Southern Suburbs
Cape Flats
Northern Suburbs
False Bay
CIDB
Grade 4CE Registered
NHBRC
Homebuilder registered
48h
Quote turnaround
5yr
Workmanship warranty
Get Your Free Site Assessment